Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
|
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
|
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
|
The project will replace an existing bridge on Sheridan Blvd that travels over the BNSF and UP railroad tracks. Work will be done in two phases and include the addition of sidewalks on the bridge, drainage work, and precast panel walls. The bridge will be lengthened to allow for future RTD FasTracks to go underneath the bridge. Location: Arvada, CO |
|
The first phase of the project will be done at the intersection of Laporte and Whitcomb and will replace an existing box culvert with a low profile box to provide a full depth paving thickness. Work at Arthurs Ditch is being performed within the floodplain, so elevation tolerances are extremely critical. Phase II of the project will replace an existing bridge on Shields Street. Along with the bridge construction, enhancements to the area include pedestrian rail, decorative columns, and sidewalks. The two bridges to be replaced are two of Fort Collins’ poorest structures. Location: Fort Collins, CO |
|
Construction of a new two span bridge over the Saint Vrain River. Work also includes reconstruction of two miles of roadway including intersection improvements of CR 17 and CR 19. Location: Platteville, CO |
|
Replacement of existing bridge over the Little Thompson River with minor road widening. Location: Berthoud, CO |