Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
|
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
|
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
|
Replace the existing structure that was originally built in 1959. The new bridge will be wider to accommodate an additional turn lane from eastbound 84th Ave to northbound I-25. In addition there will be 10-foot wide sidewalks on each side of the bridge to improve pedestrian and bicycle safety. Location: Thornton, CO |
|
Replacement of the existing bridge at Havana Street over Cherry Creek. Construction will be in three phases starting with the eastern most portion of the bridge. In addition 8’ wide sidewalks north and southbound will be constructed on the new bridge for pedestrian and bicycle safety. Location: Denver, CO |