State Highway 7 Bridge across the Platte River
|
Replacement of the existing bridge across the Platte River. The substructure of the new bridge consisted of drilled 54” caissons for pier support and steel H-pile driven for abutment support. Approximately 12,000 square feet of retaining wall was built to facilitate widening the south side of Highway 7.
Location: Brighton, CO |
![]() ![]() ![]() ![]() ![]() see below to scroll through photos & enlarge
|
-
Click to enlarge
Highway 7 Girders
5/23/2011
-
Click to enlarge
Cranes at Highway 7
5/23/2011
-
Click to enlarge
Cranes at Sunset at Highway 7
5/23/2011
-
Click to enlarge
Highway 7 Cranes
5/23/2011
-
Click to enlarge
Highway 7
5/23/2011
-
Click to enlarge
Highway 7 Bridge Demolition
5/12/2011
-
Click to enlarge
Highway 7 Caisson Drilling
5/12/2011
-
Click to enlarge
Highway 7 Caisson Placement
5/12/2011
-
Click to enlarge
Concrete Deck Machine
5/12/2011
-
Click to enlarge
Highway 7 Caisson Rebar
5/12/2011
-
Click to enlarge
Highway 7 Concrete Deck Pour
5/12/2011