Pratt Parkway Bridge

Zak Dirt, Inc. is working on a bridge replacement, minor channel rehabilitation, a bike path and retaining walls.

Location: Longmont, CO
Owner: City of Longmont
Contract Amount: $6,200,000.00
Start Date: 12/31/2017
Completion Date: 9/29/2018

see below to scroll through photos & enlarge

Project Updates:

A soil-nail shoring wall is currently being constructed along the project phaseline to allow for the new longer bridge by preventing collapse of the roadway. We are also drilling fifteen caissons for the substructure of the west half of the bridge. The girder plant has begun to cast the phase 1 concrete box girders, and the retaining wall block supplier has begun to cast blocks for our design-build geogrid-reinforced retaining wall at the south abutment.

Updated By: admin

Phase 1 traffic switch and phase 1 bridge demolition is complete. We are working to install shoring and caissons.

Updated By: admin

As always, weather or encountering unknown conditions may cause unforeseen delays to the construction schedule. Every effort will be made to inform you and keep you apprised of changes.